MASONRY
55 Goldhawk Road, Facade Restoration Work,
aug. – sept. 2012
Private residents with commercial premises in the ground floor.
London Stone conservation were nominated by Rozz Barr Architects to carry out stone and stucco repairs to the exterior ornate elements of the façade.
The architectural ornament of the groundfloor areas consisted of Bathstone. The existing stone was covered in several thick layers of paint, with numerous areas of structural stonework failing.
Closer inspection of the stonework revealed that previously carried out cementicious repairs and filler had started to fail and fall away from the façade.
Cracked and blistering paintwork causing surface corrosion of the stone were also contributing to the structural failure of the stonework.
Areas of the stonework that were presenting these kind of faults were stripped and any previous cementicious repairs and filler was removed.
Stone suffering from surface corrosion was removed and cut back to a sound base.
LSC sourced a bathstone which matched the original in colour and texture as closely as possible.
Areas of structural stonework were replaced on a like for like basis, with the new stones being doweled into position using stainless steel threaded bar and cramps. The contures of the original were than handworked and finished in situ.